<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">TACS</journal-id><journal-title-group><journal-title>Technology and Application of Computer Science</journal-title></journal-title-group><issn>2998-8926</issn><eissn>2998-8934</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/TACS.2026080013</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>基于多源数据交互与数字孪生赋能的建筑工程量智能测算平台设计与应用研究</title><url>https://artdesignp.com/journal/TACS/3/8/10.61369/TACS.2026080013</url><author>卢建斌</author><pub-date pub-type="publication-year"><year>2026</year></pub-date><volume>3</volume><issue>8</issue><history><date date-type="pub"><published-time>2026-04-28</published-time></date></history><abstract>针对建筑工程量测算中图纸资料分散、人工识别效率低、清单规则口径不一致和变更数据难同步等问题，提出一种基于多源数据交互与数字孪生赋能的建筑工程量智能测算平台。平台以BIM/CAD 图纸、工程清单规范、施工过程数据、现场图像/ 无人机数据和历史造价数据为数据底座，构建&amp;ldquo;数据采集&amp;mdash; 模型解析&amp;mdash; 规则计算&amp;mdash; 数字孪生映射&amp;mdash; 工程量输出&amp;mdash; 审计校核&amp;rdquo;六层架构。研究通过DTID 统一对象编码，将构件实体、空间位置、工程量结果、清单编码和变更版本进行动态关联，实现自动测算、清单生成、变更追踪和审计复核。某高校综合实训楼建筑智能化工程脱敏验证表明，平台测算总耗时由22.5小时降至7.2小时，初稿错漏率由8.6% 降至3.1%，变更追溯时间由2.6小时/ 项降至0.4小时/ 项，清单一致性由83.5% 提升至96.8%。研究可为工程造价数字化、智能审计和全过程成本管控提供可落地的平台化路径。</abstract><keywords>多源数据交互,数字孪生,工程量测算,工程造价,建筑智能化,智能审计</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1]Sacks R, Eastman C, Lee G, Teicholz P. BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers[M]. 3rd ed. Hoboken: John Wiley &amp;amp; Sons, 2018.[2]ISO. ISO 19650-1:2018, Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)-Information management using building information modelling-Part 1: Concepts and principles[S]. 2018.[3]ISO. ISO 19650-4:2022, Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)-Information management using building information modelling-Part 4: Information exchange[S]. 2022.[4] 住房和城乡建设部. 建设工程工程量清单计价标准: GB/T 50500-2024[S]. 北京: 中国计划出版社, 2024.[5]Boje C, Guerriero A, Kubicki S, Rezgui Y. Towards a semantic Construction Digital Twin: directions for future research[J]. Automation in Construction, 2020, 114:103179.[6]Douglas D, Kelly G, Kassem M. BIM, Digital Twin and Cyber-Physical Systems: crossing and blurring boundaries[J/OL]. arXiv:2106.11030, 2021.[7]Hosamo H H, Nielsen H K, Alnmr A N, Svennevig P R, Svidt K. A review of the Digital Twin technology for fault detection in buildings[J]. Frontiers in Built Environment, 2022, 8:1013196.[8]Thelen A, Zhang X, Fink O, Lu Y, Ghosh S, Youn B D, et al. A Comprehensive Review of Digital Twin-Part 1: Modeling and Twinning Enabling Technologies[J/OL]. arXiv:2208.14197, 2022.[9]Karabulut E, Pileggi S F, Groth P, Degeler V. Ontologies in Digital Twins: A Systematic Literature Review[J/OL]. arXiv:2308.15168, 2023.[10]Taghaddos H, Mashayekhi A, Sherafat B. Automation of Construction Quantity Take-Off: Using Building Information Modeling (BIM)[J/OL]. arXiv:1906.02400, 2019.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
