<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ME</journal-id><journal-title-group><journal-title>Modern Engineering</journal-title></journal-title-group><issn>2996-6973</issn><eissn>2996-6981</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ME.2026070017</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>新能源工程施工进度管控优化措施</title><url>https://artdesignp.com/journal/ME/3/7/10.61369/ME.2026070017</url><author>邸文亮</author><pub-date pub-type="publication-year"><year>2026</year></pub-date><volume>3</volume><issue>7</issue><history><date date-type="pub"><published-time>2026-07-20</published-time></date></history><abstract>随着风电、光伏等新能源工程建设规模持续扩大，工程施工场地分布广泛，户外作业占比较高，施工工序交叉复杂，其进度控制难度显著高于常规基建工程。传统进度控制方式主要依赖人工排班与经验整合，工序衔接较为粗糙，资源调配存在滞后，动态调节能力不足，难以满足新能源工程高效推进的需求。本文以新能源工程施工现场为研究对象，从施工前期准备、工序过程控制、人员与设备资源调配、现场动态管理及技术提升等方面入手，系统梳理风电、光伏工程进度管控的优化措施。通过落实全过程精细化进度管理，有效控制交叉工序的施工节奏，提升资源利用率，减少施工停滞与延误，确保新能源工程施工按时、保质完成建设任务。</abstract><keywords>新能源工程,施工建设,进度管控,优化措施</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1] 王建国. 新能源风电工程建设施工的管理要点[J]. 大众标准化, 2025(16):83-85.[2] 李原州. 新能源工程施工质量动态管控技术研究[J]. 中国航班, 2025(6):78-80.[3] 汪志良. 新能源工程中的施工技术与管理分析[J]. 电子技术, 2023(6):145-147.[4] 蒋桦. 新能源光伏发电项目施工进度控制方法[J]. 自动化应用, 2023, 64(17):79-81.[5] 唐继文. 新能源风电工程建设施工的管理要点探讨[J]. 大众标准化, 2023(9):67-69.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
