<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">IED</journal-id><journal-title-group><journal-title>International Economy and Development</journal-title></journal-title-group><issn>2995-4339</issn><eissn>2995-4355</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/IED.2025020001</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>EPC工程总承包模式下的项目管理与风险控制研究</title><url>https://artdesignp.com/journal/IED/3/2/10.61369/IED.2025020001</url><author>陆伟杰</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>3</volume><issue>2</issue><history><date date-type="pub"><published-time>2025-02-20</published-time></date></history><abstract>传统平行发包存在界面损耗的问题，而EPC模式凭借集成化管理将这种损耗予以消除，同时其单点责任制的契约特征对项目管理提出更高要求。项目成功的关键支撑由设计阶段对方案可实施性的预判、采购环节供应链的动态协调以及施工界面的立体化统筹共同构成。在当前的工程实践中，管理要素常呈现出碎片化运作的状态，这往往会致使进度延误与成本失控，风险传导的蝴蝶效应在总承包模式下被显著放大。本文从全生命周期的视角出发，针对管理要素的耦合关系展开解析，构建起关于风险责任分配的博弈模型，探索通过管理流程再造和风险工具创新实现项目价值的最大化释放。</abstract><keywords>EPC工程总承包,项目管理,风险控制,管理模式</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1]刘玲.EPC工程总承包模式下的项目管理与风险控制[J].今日财富,2024,(25):122-124.[2]姜宏.EPC工程总承包模式下项目管理标准化的探讨[J].中国市场,2024,(04):104-107.[3]庄建新.工程总承包模式下装配式建筑项目管理协同研究[J].中国招标,2024,(08):171-174.[4]殷俊涛.工程项目总承包的设计、采购、施工模式风险管理研究[J].城市开发,2024,(13):158-159.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
