<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ETQM</journal-id><journal-title-group><journal-title>Engineering Technology and Quality Management</journal-title></journal-title-group><issn>2995-3170</issn><eissn>2992-9806</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ETQM.2026060009</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>适应高标准住宅建设的预算编制技术与审核关键技术研究</title><url>https://artdesignp.com/journal/ETQM/4/6/10.61369/ETQM.2026060009</url><author>俞璐烨</author><pub-date pub-type="publication-year"><year>2026</year></pub-date><volume>4</volume><issue>6</issue><history><date date-type="pub"><published-time>2026-06-20</published-time></date></history><abstract>本文以高标准住宅项目工程造价预算编制为研究对象，以颛桥东苑米兰特色小镇三期项目为具体案例，从材料价格下浮确定、工程量核算准确性、价差风险控制等造价核心问题入手，对预算编制与审核过程中技术要点进行分析。采用多源价格数据对比、建安成本弹性预留和主材价差风险测算方法，解决高标准住宅中材料价格下浮比例取定、专业界面交叉和不同面积口径混用造成造价偏差的问题，总结出可操作的预算编制和审核经验，为提高高标准住宅项目造价准确性、成本可控性提供实践参考。</abstract><keywords>高标准住宅,预算编制技术,预算审核,造价准确性</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1] 马金金. 住宅建设工程造价的规范管理措施分析[J].居舍,2025,(16):142-145.[2] 多项有线广播电视建设要求纳入国家标准《住宅项目规范》[J].广电时评,2025,(08):7.[3] 周斌. 绿色住宅建设工程的预算编制与成本控制案例研究[J].中国建筑金属结构,2025,24(07):146-148.[4] 龚成堂. 造价咨询企业在住宅建设项目中的成本控制策略与效益分析[J].居舍,2024,(32):133-136.[5] 陈乔森. 现代住宅建设中的土建工程造价控制与管理[J].居舍,2024,(27):143-145+149.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
