<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ERA</journal-id><journal-title-group><journal-title>Engineering Research and Application</journal-title></journal-title-group><issn>2995-3154</issn><eissn>2993-2742</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ERA.8534</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>风电与光伏发电施工建设中的工程管理策略研究</title><url>https://artdesignp.com/journal/ERA/2/10/10.61369/ERA.8534</url><author>张国新</author><pub-date pub-type="publication-year"><year>2024</year></pub-date><volume>2</volume><issue>10</issue><history><date date-type="pub"><published-time>2024-10-20</published-time></date></history><abstract>本文针对风电与光伏发电施工建设中的工程管理策略进行了深入研究。在探讨风电与光伏发电项目的管理策略之前，本文先概述了这两种新能源技术的原理、施工建设的独特性以及行业的现状与发展趋势，为后续管理策略的分析提供了必要的技术背景和市场环境。接着，依据工程管理理论基础，深入剖析了工程项目管理体系、风险管理、质量管理等核心议题，并就设计、采购、施工、调试与验收等关键环节提出了针对性的管理措施。进一步地，本文着重研究了进度管理策略和成本管理策略，涵盖了进度计划的编制与优化、监控与调整以及风险分析与应对，同时也包括了成本预算与控制、分析与优化、风险防范与处理等关键领域。最终，为了保障工程管理策略的高效执行，本文提出了构建完善的组织管理体系、提升项目管理团队的专业素质、强化信息化建设与应用、完善相关法律法规及政策支持等一系列保障措施。这些措施共同构成了确保风电与光伏发电项目成功管理的坚实基石。</abstract><keywords>风电发电,光伏发电,施工建设,工程管理,管理策略</keywords></article-meta></front><body/><back><ref-list/></back></article>
