<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ERA</journal-id><journal-title-group><journal-title>Engineering Research and Application</journal-title></journal-title-group><issn>2995-3154</issn><eissn>2993-2742</eissn><publisher><publisher-name>Art and Technology</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ERA.2026080020</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>大型机场不停航施工过程的应急管理研究</title><url>https://artdesignp.com/journal/ERA/4/8/10.61369/ERA.2026080020</url><author>何怡甫,郜佳琳</author><pub-date pub-type="publication-year"><year>2026</year></pub-date><volume>4</volume><issue>8</issue><history><date date-type="pub"><published-time>2026-08-20</published-time></date></history><abstract>研究结合我国西南某大型国际机场不停航施工管理经验，通过归纳分析，总结出一套安全应急管控措施，可以有效地提高施工现场管理水平，完善各类安全防范措施，及时排除安全隐患，降低不停航施工对机场运行影响，杜绝不停航施工安全事故发生。实践证明：不停航施工需要先进的技术和高效的应急管理策略，在经验丰富的专业管理团队和有序的施工组织下，不停航施工可安全完成。</abstract><keywords>大型机场,不停航施工,应急管理</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1] 何洪刚. 民航机场飞行区扩建工程不停航施工项目管理[J]. 工程技术研究, 2022, 4(1): 63-64.[2] 赵闵建. 探究民用机场不停航施工安全管理措施[J]. 建材与装饰,2019(20):168-169.[3] 赵继成, 李建华, 张乐乐, 等. BIM 技术在珠海机场改扩建项目不停航施工中应用[J]. 建筑技术开发, 2022, 49 (16): 87-89.[4] 刘敬新, 金立欣. 浅议机场不停航施工的安全风险管理[J]. 民航管理, 2018(11):64-66.[5] 王辉. 民航机场场道工程不停航施工组织与安全管理[J]. 科技创新与应用, 2023, 13 (01): 143-146.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
